Odisha Renewable Energy Development Agency, Bhubaneswar, has issued the tender for Design, Supply, Installation, Commissioning and Maintenance for a period of 5 years of Rooftop Solar PV Plant with Battery Backup in Select Government Buildings.
The total capacity of Solar with Battery – 77 KW solar with 82.8 Wh
Last date(online) – 16.10.2019
Last date (offline) – 17.10.2019