Applications invited for Setting Up of Charging Stations for Electric Vehicles along Noida-Greater Noida Metro Corridor :
- Pre-submission meeting: 24.10.2019
- Last Date of Application submission: 07.11.19
The Broad Scope of Work for the implementing Agency shall be as under:
- Implementing Agency shall be responsible for Installation, Operation and Maintenance of Public Charging Stations (PCS)/Fast Charging Stations (FCS)/ Battery Charging Stations(BCS)/Battery Swapping Facility(BSF) for designated period as per parameters laid down in the GOI guidelines dated 14.12.2018 (attached in Appendix 2) on the along the Noida-Greater Noida Metro Corridor.
- In the case of Public Charging stations, requirements are as follows:
- Every public charging station shall have the following minimum infrastructure:
- An exclusive transformer with all related substation equipment including safety appliance o 33/11 KV line/cables with associated equipment including as needed for line termination/ metering etc.
- Appropriate civil works
- Adequate space for charging and entry and exit of vehicles
- Current international standards that are prevalent and used by most vehicle manufacturers internationally are CCS and CHadeMO. Hence Public Charging Stations shall have, one or more electric kiosk/ boards with the installation of all the charger models