SECI has issued the RFS for selection of Solar power developer for setting up of 04 MW grid-connected floating solar PV power project with 02 MW/1 MWh BESS at Kalpong Dam, Diglipur, North Andaman.
Battery Technology -
- Any battery technology with a totally Maintenance-Free characteristic suitable for operation in site-specific climatic conditions can be used.
- Capacity – 2MW / 1MWh