Gujarat Power Corporation Ltd. (GPCL) has issued the tender for for design, engineering, supply & procurement, construction, erection, testing, commissioning, operation and maintenance of integrated solar energy project at Sun Temple town of Modhera, District Mehsana, Gujarat (termed as “Solarisation Of Modhera Sun Temple And Town”)
Solar Capacity - 2 x 3 MW (AC) and 50 kW (AC) at Sujanpura village and Modhera Sun Temple respectively.
Battery - 2 Nos. x 7.5 MWh Battery Energy Storage System (BESS) proposed at Sujanpura, Gujarat and 150 kWh Battery Energy Storage System (BESS) proposed at near Modhera Temple.