Maharashtra Energy Development Agency (MEDA) has issued a tender for survey, design, fabrication, supply, installation, testing and commissioning of grid-connected solar PV power plant with full load battery backup (hybrid system) for 4 hrs under roof-top net metering with capacity of 8 KW, at each primary health Center and total 272 KW for 34 Nos of primary health center in Nagpur district in the state of Maharashtra through DPC, Nagpur fund with comprehensive maintenance contract for 5 years.
Storage: 12V LFP battery with 4000-5000 cycle duty at 25 degree C for 90% depth of discharge.
NOTE: battery bank should provide back up for 4 hrs under roof-top net metering with capacity of 8 kw, at each primary health center and total 272 kw for 34 nos of primary health center.
Project details:
- Pre-bid Meeting – 21.05.2020